Quality Assurance System

Bond Pull Die Shear

Bond Pull Die Shear

 

Our quality assurance management system monitors and evaluates all other ATP processes through establishing Key Process Indicators to assure customer satisfaction.

It is our Quality Policy to provide our customers with high quality, custom products and we measure our external success through achievements in the following areas:

Continual Business improvements in customer and supplier partnerships, training and resource allocation.

Continual Process capability improvements for our products and processes

Continual Yield improvements

On-time delivery that meets our customer’s needs

Highlights to our Quality Assurance Management System includes:

AS9100 Certification (Quality Manual
QMS422-01 is available for review)

ISO9001 Certification

Compliant with MIL-STD-883 test
methods as applicable and requested

Capability to adopt to and implement customer’s special visual or test requirements

Capability to adopt to and implement
customer’s Quality Clauses

100% Visual inspection per MIL-STD-883
TM2032 class H or S

Availability of multiple non-military grade
inspection criteria for customer to choose from

Screenings per MIL-PRF-38534, Appendix C, Table C-V as applicable and requested

RoHS and REACH compliant

Possession of state of the art Keyence VHX system for inspection and investigations

Capable of performing Bond Pull, Die Shear, Burn-In, Au/Sn test, Au/Si test, SEM, Temperature cycle and etc. in house

 

 
Unitek Welder

Unitek Welder

Keyence Inspection System

Keyence Inspection System

 
Temp Cycle/Shock Chamber

Temp Cycle/Shock Chamber

Certificate of Registration  

Download the “ATP Certificate of Registration” in PDF format.*

Download the “MIL-STD-883H Method 2032.3 Inspection Criteria” in PDF format.*

Request the “WSS71.02 Commercial Grade Inspection Criteria” in PDF format.*

Please use this form to request the “WSS71.02 Commercial Grade Inspection Criteria”, in PDF format. Providing your email address will ensure a quick response. We will never share your information without your permission. (Privacy Policy)

* Company
* Address
Address
* City
* State/Province
Postal Code
* Country
* Industry
* Name
* Title
* Phone
Fax
* Email
Comments
     

* Required fields.

Request the “U.S. Government Contract Requirements” in PDF format.*

Please use this form to request the “U.S. Government Contract Requirements”, in PDF format. Providing your email address will ensure a quick response. We will never share your information without your permission. (Privacy Policy)

* Company
* Address
Address
* City
* State/Province
Postal Code
* Country
* Industry
* Name
* Title
* Phone
Fax
* Email
Comments
     

* Required fields.

 

*PDF documents require Adobe Reader.

 

 

Note: ATP typically can inspect to Mil STD 883 Method 2032, ATP’s Commercial Grade WSS71.02, or Customer’s own Inspection Criteria. Standard CofC shall be provided with all shipments but does not include Screening, FAI, Sourcing Inspections, Testing, or any other deliverables. If any additional deliverables outside of ATP’s standard Certificate of Conformance (CofC) is required, then please let ATP Sales know at time of quote request so that additional charges may be considered.

Company Technologies Capabilities Design Guidelines Products Other

Introduction

Polyimide Bridges

Photomasks

Standard Dimensions, Tolerances

Inductor Coils

Home

Quality Assurance

Solder Dams

Substrates

CAD Data Guidelines

Inductor Coils Eng. Kit

Contact Us

Directions

Laser Diode Submounts

Material Specifications

Material and Conversion Tables

Microstrip Transmission Lines

Careers

Careers

Vias: Plated Through

Ion Beam

Thermal Performance

Transmission Lines Eng. Kits

Terms of Use

Sales Rep’s

Vias: Au or Cu Solid Filled

Aluminum Bonding Pads

Aging Equation

Stand Off/Isolation Pads

Privacy Policy

Contact Us

Edge Wraps

Laser Machining/Drilling

Safe Current Limits

ATP Bond Qualification Coupons

Facebook

 

Gold Bumping

Backside Burnishing

Design Resources

Product Samples

YouTube

 

Fractal Fasten

Standard Metallizations

 

Packaging/Chip Trays

 
   

Integrated TaN Resistors

 

Thin Film Resistor and Multi-Tap

 
   

Laser Resistor Trimming

     
   

Serialization